Projects
LIC #1043182 - C-7 Low Voltage Electrical - C-61/D52 Window Coverings
9880 Campus Point Drive San Diego
Coastal Pacific provided and installed 170 Draper motorized shades at all exterior windows of this five-story biotech office/laboratory building.
The company also provided, connected and programed a Somfy Animeo micro-climate-sensing building management computer and installed all low voltage wiring to allow the computer to operate each shade motor to minimize building energy use.
Project general contractor: DPR Construction
Nuvasive Amenities Building San Diego
Coastal Pacific provided and installed motorized MechoShades for conference rooms and two-story lobby including wireless switching.
Project general contractor: Good and Roberts
Dexcom San Diego
Coastal Pacific provided and installed 444 Skyco manual shades
Project general contractor: BN Builders
225 W. Broadway San Diego
Coastal Pacific has installed 590 Mariak manual shades on a tenant by tenant basis over multiple floors in high-rise office building.
Building owner: The Irvine Company
9779 Towne Centre Drive San Diego
Coastal Pacific provided and installed 124 motorized MechoShades at all exterior windows of three-story office building.
The company also provided and installed a MechoShade SolarTrac micro-climate-sensing building management computer and installed all low voltage wiring to allow the computer to operate each shade motor to minimize building energy use.
Project general contractor: Swinerton Builders
Kaiser Permanente San Diego
Coastal Pacific installed 205 manual MechoShades and shade ceiling pockets at exterior windows of medical office building.
The company also installed 42 motorized MechoShades and shade ceiling pockets with low voltage wiring and switching in lobby and common areas.
Project general contractor: DPR Construction
Airspace Carlsbad
Coastal Pacific installed 115 manual MechoShades at exterior windows in building tenant space.
Project Contractor: Good and Roberts
SONY San Diego
Coastal Pacific installed 340 manual MechoShades and 32 motorized MechoShades in shade ceiling pockets at exterior windows and with facia for interior office windows.
The company also installed 24 motorized shades with printed fabric for interior space division.
All low voltage wiring and switching were included with motorized shades.
Also installed were 12 manual skylight shades.
Project general contractor: DPR Construction
Ionis Pharmaceuticals Conference Center Carlsbad
Coastal Pacific provided and installed MechoShade motorized double shades (blackout and sunscreen) at conference rooms including low voltage wiring for control by conference room audio visual control computers.
Project general contractor: DPR Construction
Deloitte San Diego
Coastal Pacific installed manual shades at all exterior windows and motorized double shades (sunscreen and blackout) at conference room windows along with low-voltage wiring to wall switches and to the room audio-visual controls. Also installed were hanging wall panels for room separation.